Conditional Use CU 22-02 Townsend Farms Addition/Expansion - 960 Young St (2)

Project ID: 
CU 22-02, DR 22-11, & VAR 22-09
Project Type:
Land Use
Project Status: 
Approved
Date Received: 
Wednesday, July 20, 2022
Location: 
960 Young St
Woodburn, OR 97071

Description:  The applicant's narrative submitted July 20, 2022 stated:

"Townsend Farms is proposing an approximate 10,400 square foot addition to their existing operations at the above referenced property. The existing operation consists of a single-floor building and equipment for the process, the packaging, and the temporary storage of produce. This produce is transported to the property from local farms during harvest season, temporarily stored, and packaged to be processed at this facility or shipped to other Townsend Farms facilities.  The proposed development will include the demolition of 8,000 sf of the east end of Building B, which consists of a concrete slab-on-grade foundation and a steel and wood framed superstructure. A new 10,400 sf pre-engineered metal building structure ...".

Following Planning Commission approval with conditions on January 26, 2023, the developer through the Public Works Department Engineering Division bonded the public improvements in order to obtain issuance on June 20, 2023 of building permit 971-23-000102-STR-02 ("Public Improvements Performance Bond", Liberty Mutual Surety Bond No. 53S207865 of March 31, 2023 for $200,268).

However, the developer on August 9, 2023 applied for a Modification of Conditions MOC 23-03 to dispense with (1) Young Street improvements and (2) east shrubbery screening of the outdoor storage yard visible from Young Street.

 

Applicant:

Hunter Wylie, President

Crow Engineering, Inc.

9925 SW Nimbus Ave, Suite 110
Beaverton, OR 97008-7592

(503) 213-2013

hunter.wylie@crowengineering.com

 

Applicant's Representative:

Kirk Hall, Drafter/Designer III

Crow Engineering, Inc.

9925 SW Nimbus Ave, Suite 110
Beaverton, OR 97008-7592

(503) 213-2013

kirk.hall@crowengineering.com

City case planner / reviewing planner:  Colin Cortes, AICP, CNU-A, Senior Planner.

CU 22-02 Perspective drawing northeast view
CU 22-02 Perspective drawing southeast view
Townsend Farms logo
Marion County assessor aerial view marked